Detailed engineering project for Treatt's new chemical plant in the UK
The works carried out by included process validation, mechanics, 3D model development (Piping, Supports, Structures, Electricity, Instrumentation), stress analysis, calculations and civil design, drawing of drawings (isometrics, layouts of plant units, detailed drawings of structures and platforms, civil drawings, etc.), issuance of all construction drawings of the different disciplines, support to manufacturing (workshop and field).
It is about a two-year, 12,000 man/hour engineering project.