Risk study and procedures for the BBG terminal, Bilbao

Detailed engineering project for the upgrade of the Boil-Off Gas system. The project included a complete laser survey and a 3D model of the LNG and BoG system area to install a new desuperheater to improve the efficiency of the BoG compressor.

The main activities included the process, the design of the main equipment, safety studies, the 3D instrumentation and control model and the new structural support.