Risk study and procedures for the BBG terminal, Bilbao

Performance of Ship-to-Ship (STS) operations procedures at the Bahía de Bizkaia Gas facilities.


Risk studies: HAZID, HAZOP, QRA, SIMOPS for the following scenarios:

1. STS Operation
2. Ship-to-terminal operation
3. Simultaneous STS and Ship-to-Terminal operation