FEED for high pressure gas production without assisted compression
Platform 47/3B offshore (Rough, North Sea) and Easington Onshore Gas Terminal, United Kingdom
FEED for the future phase of extraction and processing of 183 billion cubic feet of natural gas from the Rough field in the North Sea. The validity of existing equipment, pipelines, instrumentation and associated systems, both onshore and offshore, was verified to meet the new high pressure operating conditions without assisted compression.
In addition, OSL Iberia conducted a second technical study to correct and optimise the operation of the fuel gas system, used to generate electricity on the offshore platform, which had ongoing operational problems.