Basic engineering and design (FEED) of product quality improvement at an LPG plant, United Kingdom.

Preliminary project for the definition of objectives, capacities and innovative improvements in the installation of the following elements:

  • Three storage tanks of 3000 m3 per tank.
  • 8’ bi-directional multi-product line for connection between 3000 m3 tanks and the loading arm on pontoon F-E012.
  • Expansion of 8’ product lines in port.
  • 6’ SCI line extension parallel to the previous product line.
  • Installation of a new loading arm at jetty F-E012.
  • Transformation of the existing storage to a total of 30,000 m3 broken down into 2×12,000 m3 (tanks T13 and T14) and 2×3,000 m3 (T22 and T23) and involving insulation, mixing, heating, connection and new lines.